DOORS & HARDWARE
Exterior entry doors
Fit an exterior entry-door system with the correct swing, threshold and weather seals for the entrance. Style and glass choices are reviewed alongside frame condition, latch alignment and the surrounding finishes.
Measure slab and frame separately. Note swing from the exterior or approach side, threshold, wall depth and existing hardware.
Typical scope to confirm
Verify handing, wall depth and opening measurements
Remove and install the defined door/frame assembly
Connect specified sill and perimeter weather details
Fit selected hardware and test latching
Make it specific to your project.
Enter the amount of work and choose the details you know. Your choices follow you into the Project Builder.
LOW / MIDDLE / HIGH REFERENCE
Low$800per opening
Middle$2,400per opening
High$4,000per opening
Low and high are published reference endpoints. Middle is their arithmetic midpoint, not a quoted average, product tier or firm price.
A planning reference for this service only. Selections, local labor, access, quantities and existing conditions need Coastal’s review. Do not add overlapping whole-project and component ranges.
HomeGuide · research checked 2026-10-22 · US national · installed
Sidelights, transoms and smart access unless listed
Hidden sill or wall damage
Sidelights
Opening enlargement
Concealed repairs
KNOW WHAT COMES NEXT
From first idea to finished work.
Plan the scope
Confirm security, swing, threshold and exterior exposure.
Prepare and approve
Confirm product fit, support, weather exposure and any opening changes.
Complete the work
Fit and fasten components; integrate seals and finish affected trim.
Review and close out
Check swing or sliding travel, latch operation, clearances and weather seals.
Planning & preparation
1–8 weeks
Work on site
1–3 working days
Illustrative planning allowance for the stated scope, not a promised start or completion date. On-site time starts after approvals and materials are ready; procurement, inspection waits, curing and discoveries can extend the calendar.
Custom door lead time · Frame repairs or opening alterations · Finish work and access-control coordination
PERMIT PLANNING
Check the scope and jurisdiction
Permit needs depend on the work and property address. OKC and Edmond review structural alterations; Moore requires permits for most remodels. Confirm finish-only exceptions and any separate trade permits.
Changes to walls, structure or building use
Electrical, plumbing or HVAC changes
Work within a floodplain or historic district
ENGINEERING & DESIGN
Engineering is not usually needed
Engineering is not usually part of this finish-only scope. Stop for review if hidden damage, structural changes or unusual support loads are found.
New structural work or damaged framing
Unverified heavy-load support
Confirm requirements with the city or county responsible for the property before work begins. The address, exact scope and adopted code determine the final requirements.
Choose daylight, privacy pattern and the required safety-glass assembly.
Door type: Entry
Glass: Half lite
Custom product, finish code, or request: Entry door with glass. Finish direction: Dark bronze. Choose daylight, privacy pattern and the required safety-glass assembly.
Replace the door with a coordinated frame and weather seals.
Door type: Entry
Assembly: Pre-hung
Custom product, finish code, or request: Pre-hung replacement. Finish direction: Matte black. Replace the door with a coordinated frame and weather seals.
Reviewed 2026-10-23. Published ranges describe the source’s stated scope and geography; they are not an Oklahoma adjustment or a Coastal estimate. Do not add overlapping project ranges together.