Explore a scope and request a reviewed quote. Coastal confirms service availability, qualified trade partners, site conditions and final pricing before a proposal.
ROOFING
Metal roofing
Select a metal roofing system around roof shape, slope and fastening method. Panel profile, coatings, trim and penetration details should be coordinated as a complete system.
Use measured roof surface area or a reliable roof report, not the home’s floor area. Record pitch, stories, layers, edges and penetrations.
Typical scope to confirm
Measure roof planes and verify substrate and slope
Select panel profile, metal and coating
Detail edges, transitions and penetrations
Coordinate underlayment, ventilation and compatible fasteners
Make it specific to your project.
Enter the amount of work and choose the details you know. Your choices follow you into the Project Builder.
LOW / MIDDLE / HIGH REFERENCE
Low$9per sq ft
Middle$12.50per sq ft
High$16per sq ft
Low and high are published reference endpoints. Middle is their arithmetic midpoint, not a quoted average, product tier or firm price.
Match the reference scope first
Confirm Roof system before applying this reference to your quantity. The displayed rate is standing-seam metal, not exposed-fastener metal.
Confirm Work before applying this reference to your quantity. These roof-coverage rates do not price repair, tie-ins, flashing or ventilation as equivalent work.
The figures above remain the source reference. They do not price these selections or a complete installed project.
A planning reference for this service only. Selections, local labor, access, quantities and existing conditions need Coastal’s review. Do not add overlapping whole-project and component ranges.
HomeGuide · research checked 2026-10-22 · US national · installed
Solar equipment or specialty snow-management systems
Structural repairs
Unpriced tear-off
Premium copper/zinc systems
KNOW WHAT COMES NEXT
From first idea to finished work.
Plan the scope
Confirm metal profile, substrate, fastening and thermal-movement details.
Prepare and approve
Confirm the roofing system, permit scope, weather window and property protection.
Complete the work
Remove affected roofing, review decking and install the selected roof and flashing.
Review and close out
Inspect details, clear debris and review product and workmanship information.
Planning & preparation
2–8 weeks
Work on site
3–10 working days
Illustrative planning allowance for the stated scope, not a promised start or completion date. On-site time starts after approvals and materials are ready; procurement, inspection waits, curing and discoveries can extend the calendar.
Roof complexity and weather · Concealed decking or framing damage · Specialty materials and structural repairs
PERMIT PLANNING
Check the scope and jurisdiction
OKC requires a reroofing permit when work on an existing one- or two-family home exceeds 500 sq ft; altered rafters or ridge beams need a building permit. Norman’s asphalt-shingle FAQ says roofing itself needs no permit. Confirm the address and structural scope.
OKC reroofing over 500 sq ft
Replacement or alteration of structural roof members
Edmond substantial roof replacement; minor shingle repairs have an exception
ENGINEERING & DESIGN
Confirm design requirements
Review the load path, existing supports and proposed changes before work. An engineer may be needed for nonstandard spans, added loads, damage or a reviewer-requested design; a permit alone does not mean every detail needs engineering.
Load-bearing changes or uncertain framing
Nonstandard spans, concentrated loads or damaged supports
Soil, foundation or retaining conditions beyond an approved design
Confirm requirements with the city or county responsible for the property before work begins. The address, exact scope and adopted code determine the final requirements.
Review a specialty appearance with its own assembly requirements.
Main color / finish: Soft white
Custom product, finish code, or request: Metal shingle or tile profile. Finish direction: Soft white. Review a specialty appearance with its own assembly requirements.
Reviewed 2026-10-23. Published ranges describe the source’s stated scope and geography; they are not an Oklahoma adjustment or a Coastal estimate. Do not add overlapping project ranges together.