Explore a scope and request a reviewed quote. Coastal confirms service availability, qualified trade partners, site conditions and final pricing before a proposal.
CONCRETE & STORM SHELTERS
Addition foundations and slabs
Build the foundation for an addition from a plan that addresses the existing home and site conditions. Footings, slab edges, reinforcing and utility penetrations must be coordinated before concrete is placed.
Measure length, width and thickness separately. Note base, access and excavation. Shelter dimensions and anchoring follow the selected product and engineered requirements.
Typical scope to confirm
Confirm design elevations, soil assumptions and connection details
Excavate and form specified footings and slab edges
Place reinforcing and required moisture-control layers
Coordinate penetrations, placement, curing and inspection points
Make it specific to your project.
Enter the amount of work and choose the details you know. Your choices follow you into the Project Builder.
LOW / MIDDLE / HIGH REFERENCE
Low$10per sq ft
Middle$12per sq ft
High$14per sq ft
Low and high are published reference endpoints. Middle is their arithmetic midpoint, not a quoted average, product tier or firm price.
A planning reference for this service only. Selections, local labor, access, quantities and existing conditions need Coastal’s review. Do not add overlapping whole-project and component ranges.
HomeGuide · research checked 2026-10-22 · US national · installed
Reinforcement, slab thickness and utility penetrations
What the reference covers
Footing/slab materials
Installation labor
Allow for these separately
Foundation underpinning unless engineered and scoped
Building superstructure and finish flooring
Site preparation
Engineering
Unusual soil remediation
Existing-foundation strengthening
KNOW WHAT COMES NEXT
From first idea to finished work.
Plan the scope
Confirm building loads, footing design, elevations and soil conditions.
Prepare and approve
Review design and approvals; arrange excavation, forms and reinforcement.
Complete the work
Inspect as required before placement, then place and finish the concrete.
Review and close out
Protect curing work and confirm when loads or traffic may be introduced.
Planning & preparation
2–8 weeks
Work on site
1–3 weeks plus curing
Illustrative planning allowance for the stated scope, not a promised start or completion date. On-site time starts after approvals and materials are ready; procurement, inspection waits, curing and discoveries can extend the calendar.
Excavation and base condition · Placement access and weather · Inspections and required curing
PERMIT PLANNING
A permit is required for the stated scope
New buildings and substantial additions require building permits in OKC, Edmond and Moore. Confirm site approvals and any separate electrical, plumbing and mechanical permits for the selected address.
New dwelling or substantial new building
New enclosed floor area or change of use
New or altered utility systems
ENGINEERING & DESIGN
Engineering required for these conditions
Edmond requires an engineered footing design for the footprint additions covered by its alteration/addition checklist. Other locations and existing-space conversions need scope-specific structural review.
An Edmond footprint addition under the city alteration/addition checklist
New loads on existing framing or foundations
Unusual soil conditions or nonstandard structural details
Confirm requirements with the city or county responsible for the property before work begins. The address, exact scope and adopted code determine the final requirements.
Reviewed 2026-10-23. Published ranges describe the source’s stated scope and geography; they are not an Oklahoma adjustment or a Coastal estimate. Do not add overlapping project ranges together.